Woodside Mini Park (at SW 3699/3701 SW 1st Avenue)

Forever-Bond-Logo-002.png
Please note that the entire site of the park will be closed during construction!
A New Mini Park in the Neighborhood in District 3 - Un Nuevo Parque en el Distrito 3!
  • Construction on a new park will begin on December 15, 2023 - Construccion comenzará el 15 de diciembre del 2023
  • Green space in park will remain open until that time - El acceso al área verde permanecerá abierto hasta esa fecha 
  • Once construction begins, the entire park will be closed - Cuando la construcción el acceso al parque cerrará
  • Construction status to be posted once construction begins - Les mantendremos informados sobre el avanze de la construcción
  • Phase I Groundbreaking Ceremony/ Habrá una Ceremonia de Inicio de Obras:  Friday, December 15, 2023 at 10:30am - Viernes, 15 de diciembre del 2023 a las 10:30am– more details will be posted soon - más detalles muy pronto!  

    Design Plans for the New Mini Park: The image below shows the different elements that will be part of the new mini park.  It depicts an open lawn area, a playground, a dog park for small dogs (under 15 pounds) and another dog park for larger dogs. It also shows the location of several large and beautiful trees that were kept from the original properties.  

    Plan de Diseño del Nuevo Mini Parque: La imagen de abajo muestra los elementos que serán parte del nuevo miniparque.  Muestra un área verde, un área de      juego para niños, áreapara perros pequenos (abajo de 15 lbs.) y otra área para perros más grandes.  Muestra también la ubicación de muchos frondosos y lindos árboles que fueron preservados de las propiedades anteriores.  A-Woodside Mini Park.png

About the Project

The City of Miami, D3 Commissioner Joe Carollo, the Department of Parks & Recreation and the Office of Capital Improvements (OCI) proudly announce the groundbreaking ceremony of phase I of the new Mini Park in District 3, the Woodside Mini Park.  An additional lot (SW 3691) was secured in the neighborhood to increase the new mini park area, this will be phase II. The demolition of the existing property at 3691 will take place after the groundbreaking ceremony.

  • Elements of phase I of the new mini park project include:
  • Walkway
  • Bike rack
  • Benches
  • Tree relocation and green space
  • Exercise equipment
  • New perimeter fence

The new park elements will include:

  • Two (2) separate playground areas for children (2-5 years old and children 5-12 years old)
  • Bicycle racks and a 6 foot-wide concrete bike bath, benches and walkway paths around landscaped green areas
  • Plenty of trees for shade and comfort and a covered shelter area
  • Two (2) separate dog areas for dogs 35lbs and under, and over 35lbs.
  • Roadway Improvements around the park

 
Provide your feedback about this project here

Los elementos del nuevo parque incluirán:

  • Área de juegos (dividida para niños de 2-5 años de edad y 5-12 años de edad)
  • Estacionamiento y sendero para bicicletas (6 pies de ancho), bancas y caminos alrededor de áreas verdes con pasisajisom
  • Abundantes árboles para dar sombra y comodidad
  • Mejoras viales alrededor del parque

 Deja tus comentarios sobre este proyecto aquí

Community Meeting

Final Community Meeting Held on Wednesday, September 29th, 2021

Residents under a tent in an open field for the 3699/3701 SW 1 Avenue Mini Park Final Community Meeting

2 Residents with a dog near a large tree at the site of the future 3699/3701 SW 1st Avenue Mini Park

The Office of Capital Improvements Guest check-in table at the 3699/3701 New Mini Park Final Community Meeting 

Existing Park Images

Park Existing Conditions   

 

Existing Conditions Tree Photos



Future Plans

Park Component Photos