|
This report has been broken into sections
in order to improve download speed.
Adobe Acrobat Reader is required to view all files and can be downloaded for free from the following link:

The City of Miami Initial Streetcar Corridor
Feasibility Study, Final Report, April 2005
is also available as one file.
Download the Report (62 MB) NOTE: Due
to file size, this may take a few minutes to
download.
The report was originally created for the
11" x 17" page size. It is best printed on
8 1/2" x 11" paper.
Executive Summary - Pages ES-1 - ES-10
Report Cover
Title Page, Acknowledgements, Table of
Contents, and Acronyms
Section 1 - Introduction
Section 2 - Background
Section 3 - Characteristics of Streetcars
Section 4 - Study Area
Section 5 - Description of Potential Project Corridor
Section 6 - Evaluation Criteria
Section 7 - Alternative Corridors Evaluation
Section 8 - Potential Alignment Options
Section 9 - Part I Concept Plan Summary
Section 10 - Part II Study Refinement
Section 11 - Project Corridor Issues & Opportunities
Section 12 - Streetcars , Land Use , Transit Development
Section 13 - Economic Development Opportunities
Section 14 - Transportation Operations
Section 15 - Ridership Forecast
Section 16 - Alignment
Section 17 - Streetcar Stops & Station Areas
Section 18 - Maintenance Facility & Substation Locations
Section 19 - Capital & Operating Costs
Section 20 - Financial Feasibility
Section 21 - Environmental Requirements
Section 22 - Implementation Options
Bibliography
Appendix Cover Page
Appendix A (Scope of Work)
Appendix B (Metrobus and Metromover System Maps)
Appendix C (June 15, 2004 Florida East Coast Railway Meeting Materials)
Appendix D (FEC Response)
Appendix E (City of Miami Large Scale Development Report 1995 - Present
|