The City
of Miami, has determined that
Southeastern Engineering
Contractors Inc., is
the lowest responsive and
responsible bidder, and the City
Manager has accepted the
Recommendation of Award for this
project. Click on the link below
to view the Recommendation Memo
from the Manager.
Click on
the links below to view and
download the Specifications
(containing technical
specifications and geotechnical
report) bid form, reports, and
construction drawings for this
project. Check this page for
related information such as
addenda, bid results and
contract award.
Some documents are
in Adobe .pdf format. Adobe Reader
is required to view these documents.
If you do not have Adobe Reader, it
can be downloaded for free at the
following link: